Ecotron - Incubation Shaker
Installation
6.2.2 Stacking Equipment
1
1
Cover cap (4 x)
2
Insulation mat
3
Hexagon socket head screw M6x40 (4 x)
Page 44 of 90
To save space, two units of equipment can be stacked on top of
one another. The optional stack set is required to do so.
ATTENTION
If you operate stacked equipment without an installed stack set,
you run the risk of the top unit moving due to vibrations and con-
sequently falling down. You should therefore only stack equip-
ment (no more than two units) with the stack set.
2
3
4
5
6
4
Spring washer M6x11x1.1mm (4 x)
5
Disc M6x12x1.6 mm (4 x)
6
Centring sleeve (4 x)
03 May 2018
Need help?
Do you have a question about the Ecotron and is the answer not in the manual?
Questions and answers