Installing The Switch On A Wall Using The At-Brkt-J24 Brackets; What To Prepare For Wall Installation; Installing The Switch On A Wall - Allied Telesis XS910/8 Manual

10 gigabit ethernet unmanaged switch
Table of Contents

Advertisement

Installing the Switch on a Wall Using the AT-BRKT-J24 Brackets

What to Prepare
for Wall
Installation
Installing the
Switch on a Wall
The switch can be mounted on a wall using the AT-BRKT-J24 wall mount
bracket kit.
You need the following items to install the switch on a wall:
Four AT-BRKT-J24 brackets
16 M4mm x 6mm screws to attach the brackets to the switch
(included in the AT-BRKT-J24 kit)
Eight 4mm x 32mm wood screws for wall mounting
(not included)
Philiips-head screwdriver
Pencil
Drill
Note
You must provide screws to attach the brackets to the switch, a
cross-head screwdriver, a pencil, and a drill.
To install the switch on a wall, perform the following procedure:
1. Review "Reviewing Safety Precautions" on page 26 and "Selecting a
Site and Planning the Installation" on page 29 before performing this
procedure.
2. Place all the items from the packaging on a work table.
3. Attach each bracket to the switch using four screws as shown in Figure
17 on page 44.
Chapter 3: Installation Using the AT-BRKT-J24 Wall Mount Bracket
43

Advertisement

Table of Contents
loading

Table of Contents