Cisco SCE 1000 Installation And Configuration Manual page 65

2xgbe
Hide thumbs Also See for SCE 1000:
Table of Contents

Advertisement

Chapter 4 Installation and Maintenance
Using the number 2 Phillips screwdriver, securely fasten the protective plate to the terminal block.
Step 4
Connect the DC power line input leads to the DC power source through a fast 10A circuit breaker.
Step 5
Turn the on/off switch to the on position.
Step 6
Look at the IN and OK LEDs on the power supply unit and the corresponding Power LED on the front
Step 7
panel. If the new DC-input power supply unit is operating properly, these LEDs will be glowing green.
Ensure that the power supply is properly aligned and the installation screw is tightened.
Step 8
OL-26790-01
How to Reconnect DC-Input Power Supply Unit
Cisco SCE 1000 2xGBE Installation and Configuration Guide
4-23

Advertisement

Table of Contents
loading

Table of Contents