Back Panel
Table 2-4
LED Groups
GBE ports
Mng
Back Panel
The SCE 1000 platform back-panel contains the following components:
•
•
•
•
The rear panels of both the AC- and DC-powered SCE 1000 platforms are shown in
Figure
Figure 2-2
Cisco SCE 1000 2xGBE Installation and Configuration Guide
2-4
SCE 1000 LED Groups
Description
The GBE LEDs indicate the operational status of the SCE 1000 line ports, as follows:
•
Link Green - indicates that the port link is up Unlit - indicates that the port link is
down
•
Rx Flashing Green - indicates that there are incoming packets
•
Tx Flashing Green - indicates that there are outgoing packets
The Mng port LEDs indicate the operational status of the SCE 1000 out-of-band
LAN-based management port, as follows:
•
Link/Active Green - indicates that the port link is up
Unlit - indicates that the port link is down o 10/100/1000
•
Steady green - indicates that the port is set to 100 Mbps Unlit - indicates that the
•
port is set to 10 Mbps
•
Orange - indicates that the port is set to 1000 Mbps
Two field-replaceable power supply units with ON/OFF switches
A field-replaceable fan drawer
Ground connections
One connector to the external bypass module
2-3.
SCE 1000 Back Panel: AC Power
1
BY PA SS
1
IN
PO W ER B
OK
IN
PO W ER A
OK
Chapter 2 Introduction to the SCE Platform
Figure 2-2
OL-26790-01
and