Download Print this page

Maintenance And Inspection Procedures; Robot Arm Structure - Mitsubishi Electric RV-4FM-SE Series Instruction Manual

Industrial robot, robot arm setup & maintenance

Advertisement

5.3 Maintenance and inspection procedures

The procedures for carrying out the periodic maintenance and inspection are described in this section. Thoroughly
read the contents, and follow the instructions. This work can be commissioned to the Mitsubishi Service Depart -
ment for a fee. (Never disassemble, etc., the parts not described in this manual.)
The maintenance parts, etc., required for the customer to carry out maintenance and inspection are described in
Page 102, "5.5 Maintenance parts"
CAUTION

5.3.1 Robot arm structure

An outline structure drawing is shown in
shown below. Non-excitation magnetic brakes are mounted in all axis motor.
(1) RV-4F/7F series
1) The rotation of the J1 axis motor <1> arranged in the base is conveyed to the reduction gears <3> via the
timing belt <2> to rotate the J1 axis.
2) The J2 axis rotation is driven by the J2 axis motor <4> and reduction gears <5>.
3) The rotation of the J3 axis motor <7> arranged in the No.1 arm is conveyed to the reduction gears <9> via
the timing belt <8> to rotate the J3 axis.
4) The rotation of the J4 axis motor <10> arranged in the elbow is conveyed to the reduction gears <12> via
the timing belt <11> to rotate the J4 axis.
5) The rotation of the J5 axis motor <13> arranged in the No.2 arm is conveyed to the reduction gears <16> via
the timing belt <14> to rotate the J5 axis.
6) The rotation of the J6 axis motor <18> arranged in the No.2 arm is conveyed to the reduction gears <21> via
the timing belt <19> and gear <20> to rotate the J6 axis.
(2) RV-13F series
1) The J1 axis rotation is driven by the J1 axis motor <1> and reduction gears <2>.
2) The J2 axis rotation is driven by the J2 axis motor <3> and reduction gears <4>.
3) The J3 axis rotation is driven by the J3 axis motor <5> and reduction gears <6>.
4) The rotation of the J4 axis motor <7> arranged in the elbow is conveyed to the reduction gears <9> via the
timing belt <8> to rotate the J4 axis.
5) The rotation of the J5 axis motor <10> arranged in the No.2 arm is conveyed to the reduction gears <12> via
the timing belt <11> to rotate the J5 axis.
6) The rotation of the J6 axis motor <13> arranged in the No.2 arm is conveyed to the reduction gears <16> via
the timing belt <14> and gear <15> to rotate the J6 axis.
of this manual. Always contact your dealer when parts are needed.
The origin of the machine system could deviate when this work is carried out.
"Review of the position data" and "re-teaching" will be required.
Fig. 5-2
(RV-4F/7F series) and
5Maintenance and Inspection
Fig. 5-3
(RV-13F series). Each part is as
Maintenance and inspection procedures 5-79

Hide quick links:

Advertisement

loading