7) Installs the solenoid valve set on the forearm upside.
Firmly fix the solenoid valve set using the original fixing screws of the No.2 arm cover U. (Tightening torque:
1.39-1.89N ・ m).
Then, from the No.2 arm cover L side, check that the air hoses in the forearm are not bent.
8) Install the No.2 arm cover L to the forearm.
Install attached plugs to the port A/B couplings that are not used for the solenoid valve set.
A
9) Connect the tool prepared by the customer with solenoid valve port A and B.
When you use the standard specification robot, please prepare the air hoses for connection.
Table 3-6
shows the relation between hand condition and port number.
Table 3-6 : Solenoid valve ports and hand number
Hand
Hand condition
OPEN
Hand 1
CLOSE
OPEN
Hand 2
CLOSE
OPEN
Hand 3
CLOSE
OPEN
Hand 4
CLOSE
This completes the procedure to install the solenoid valve set.
Solenoid valve set
No.2 arm cover L
The solenoid
Port number
valve set in use
1
One set
2
3
Two sets
4
5
Three sets
6
7
Four sets
8
Solenoid valve set
Enlarged view of section A
Forearm
Installing the solenoid valve set 3-63
3Installing the option devices
Plugs
Port number
B port
2
4
6
8
A port
1
3
5
7