Komatsu Galeo PC138US-8 Shop Manual page 20

Hydraulic excavator
Hide thumbs Also See for Galeo PC138US-8:
Table of Contents

Advertisement

SEN01978-01
8.
Precautions for disconnecting and con-
necting hoses and tubes in air conditioner
circuit
1)
Disconnection
k
Collect the air conditioner refriger-
ant (R134a) from the air condi-
tioner circuit in advance.
a Ask professional traders for collecting
and filling operation of refrigerant
(R134a).
a Never release the refrigerant (R134a)
to the atmosphere.
k
If the refrigerant gas (R134a) gets
in your eyes, you may lose your
sight. Accordingly, when collect-
ing or filling it, you must be quali-
fied for handling the refrigerant
and put on protective goggles.
2)
Connection
1]
When installing the air conditioner cir-
cuit hoses and tubes, take care that
dirt, dust, water, etc. will not enter
them.
2]
When connecting the air conditioner
hoses and tubes, check that O-rings
(1) are fitted to their joints.
3]
Check that each O-ring is not dam-
aged or deteriorated.
4]
When connecting the refrigerant pip-
ing, apply compressor oil for refriger-
ant (R134a) (DENSO: ND-OIL8,
ZEXEL: ZXL100PG (equivalent to
PAG46)) to its O-rings.
a Example of O-ring (Fitted to every joint of
hoses and tubes)
a For tightening torque, see the precautions for
installation in each section of "Disassembly
and assembly".
6
00 Index and foreword
PC138US, USLC-8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Galeo pc138uslc-8

Table of Contents