(0) to (7)
This is a circuit to check fall of the off of the reset switch, and release the interlock established in the CC-Link IE Field Network.
(24) to (30)
This is a circuit to complete the interlocking process and cancel the request for interlocking.
(33) to (37)
This is a circuit to notify emergency stop request to the Safety CPU of the safety programmable controllers (2) and (3).
(41) to (48)
This is a circuit to check fall of the off of the start switch, and accept a request to start the circuit.
(57)
This is a circuit to check welding of the safety relay.
(64)
This is a circuit to check whether the robot is in a statue that allows starting or maintaining operation. This is a circuit to assign safety signals to
the standard/safety shared label.
(72)
This is a circuit to cancel start/reset request, when not possible to check safety.
(78)
This is a circuit to control outputs to the safety relay.