Chapter 1 Overview - Mitsubishi Electric MELSEC iQ-R Series Safety Manual

Hide thumbs Also See for MELSEC iQ-R Series:
Table of Contents

Advertisement

1
OVERVIEW
Our safety programmable controllers obtained safety approval at the highest safety level that the programmable controller can
obtain (ISO13849-1: 2006 Category 4 and PLe, IEC62061: 2012 SIL3, and IEC61508: 2010 SIL3).
The customer can use safety programmable controllers for configuring safety station with ISO13849-1: 2006 Category 4 and
PLe, IEC62061: 2012 SIL3, and IEC61508: 2010 SIL3.
Safety control and standard control programs can be simultaneously executed under a safety CPU. Similarly, both safety and
standard communications can be executed under a network.
System configuration for safety programmable controllers is shown below:
• Mount power supply module, safety CPU, safety function module, CC-Link IE Field Network master/local module on the
main base unit.
• Connect CC-Link IE Field Network master/local module and safety remote I/O module by network.
• Connect personal computer installed engineering tools to safety CPU, when setting programs and parameters.
GX Works3
Safety
control
CC-Link IE
Field Network
Safety programmable
controller (2)
Emergency
Light
Safety
stop switch
curtain
relay
Safety control
Safety programmable controller (1)
Emergency
Light
Safety
stop switch
curtain
relay
Inverter
Robot
Standard control
Standard
control
Inverter
Robot
Safety programmable
controller (3)
Emergency
Light
Safety
stop switch
curtain
relay
Safety control
Inverter
Robot
Standard control
1 OVERVIEW
1
13

Advertisement

Table of Contents
loading

Table of Contents