Prepare for Installation
This section introduces instructions you need to know before installing the RealPresence Collaboration
Server 2000.
●
Prepare the Hardware Installation Site
●
Unpack the RealPresence Collaboration Server (RMX) 2000
●
Verify the Accessories Kits
●
Install the Telescopic Rail Runner on the Rack
Prepare the Hardware Installation Site
This section describes the requirements your site must meet for safe installation and operation of the
system.
Site Safety Requirements
For your protection, please read these safety instructions completely before operating the equipment.
● Look carefully for potential hazards in your work area: moist floors, ungrounded power cables, frayed
power cords, missing safety grounds and so forth.
● Locate the main circuit breaker within the room.
● Locate the emergency power OFF switch within the room.
● Never assume that power is disconnected from a circuit.
● Use only the power cord supplied with the system.
● The power cord should only be connected to a power outlet that has a protective ground contact.
● Ensure that the power cord is easily accessible from the back of the system at all times.
● Place the equipment in a well-ventilated area where the vents are free from obstruction.
● Do not place heavy objects directly on top of the RealPresence Collaboration Server (RMX) 2000
unit.
● Do not use liquids around your equipment.
Rack Mount Safety Precautions
The following precautions should be followed with regards to rack mount safety:
● Keep the area around the RealPresence Collaboration Server (RMX) 2000 clean and free of clutter.
Polycom, Inc.
21