Mounting - GE Medical Systems Solar 9500 Service Manual

Information monitor
Table of Contents

Advertisement

Mounting

3-4
Installation: Processing Unit Setup
4. Replace cover by carefully aligning the top edge of the cover into the
hinge teeth on the back cover, then swing the front cover down until
the release tabs are fully engaged.
The processing unit MUST be installed in a vertical position with the
supplied bracket before use.
&$87,21
Operating the device in a horizontal position or without
the supplied bracket may cause damage to the
equipment.
Solar 9500 Information Monitor
2001085-061
Wall channel
009B
Revision A

Advertisement

Table of Contents
loading

Table of Contents