M-Port Check; Completion; Pm Form - GE Medical Systems Solar 9500 Service Manual

Information monitor
Table of Contents

Advertisement

M-Port Check

Completion

PM Form

6-22
Maintenance: Checkout Procedure
If connecting to a PRN 50 with AutoPort, then adapter PN 2001973-001
is required. Plug the adapter end labeled AUTOPORT into the AutoPort
device.
1. Plug the adapter (PN 2001973-001) end labeled AUTOPORT into
the Port Checkout DIDCA side labeled PORT CHECKOUT.
2. Connect one end of a category 5 cable to the adapter (on the Port
Checkout DIDCA) and the other end to one of the M-Ports.
3. Verify that the M-Port status LED illuminates green.
4. Repeat the above steps for all M-Ports.
This completes the checkout procedure.
Disconnect all test equipment.
Return the monitor and Tram-rac housing to service.
Due to continuing product innovation and because specifications in this
manual are subject to change without notice, a PM form is not included
with this manual. For the latest PM form regarding this product, contact
GE Medical Systems Information Technologies Service.
If repairs/adjustments were made or any parts replaced, describe this in
the area provided on the PM form.
Also include comments regarding any unusual environmental conditions
that may affect the operation or reliability of the equipment in the area
provided on the PM form.
On the following pages a repair log is included for your convenience to
record the repair history of this product.
Solar 9500 Information Monitor
2001085-061
Revision A

Advertisement

Table of Contents
loading

Table of Contents