Maintenance: Maintenance Schedule
To make sure the Solar 9500 Information Monitor remains in proper
operational and functional order, a good maintenance schedule must be
adhered to. The manufacturer recommends the following:
Visual Inspection: This should be performed by service personnel
upon receipt of the equipment, every 12 months thereafter, and prior
to servicing the unit.
Cleaning: This should be performed by service personnel upon
receipt of the equipment, every 12 months thereafter, and each time
the unit is serviced.
Electrical Safety Tests: These should be performed by service
personnel upon receipt of the equipment, every 12 months thereafter,
and each time the unit is serviced.
Checkout Procedure: This should be performed by qualified
service personnel upon receipt of the equipment, every 12 months
thereafter, and each time the unit is serviced.
:$51,1*
Failure on the part of all responsible individuals,
hospitals or institutions, employing the use of this device,
to implement the recommended maintenance schedule
may cause equipment failure and possible health
hazards. The manufacturer does not, in any manner,
assume the responsibility for performing the
recommended maintenance schedule, unless an
Equipment Maintenance Agreement exists. The sole
responsibility rests with the individuals, hospitals, or
institutions utilizing the device.