Mechanical Installation; Electrical Installation; Start-Up - ABB ACS380 Hardware Manual

Hide thumbs Also See for ACS380:
Table of Contents

Advertisement

Mechanical installation

Refer to
To install a front option
Before you install the BIO-01 option module, make sure that the chassis screw slider
is in the top position. After the option module is installed, tighten the chassis screw
and move the slider to the bottom position.
The BIO-01 option module kit comes with a higher cable clamp plate. Use this cable
clamp plate to ground the wires that connect to the BIO-01 option module.

Electrical installation

Refer to
Electrical installation
wiring accordingly. The BIO-01 module has removable spring clamp terminals. Use
ferrules on the multistranded cables before assembly.
Sample wiring with the ABB standard macro:
Terminals
External sample connection

Start-up

The BIO-01 module is automatically identified by the drive firmware. To configure the
inputs refer to the ACS380 firmware manual
on page 75.
on page 61. If you configure the inputs, set up the
Description
Aux. voltage output and prog. digital input
+24V Aux. output +24 V DC, max. 200 mA
DGND Aux. voltage output common
DCOM Digital input common for all
DI1
Stop (0)/Start (1)
DI2
Forward (0)/Reverse (1)
Digital and analog I/O extension BIO-01
DI3
Constant frequency/speed selection
DI4
Constant frequency/speed selection
DI5
Ramp set 1 (0)/Ramp set 2 (1)
DO1
Not configured
AI1
Output frequency/speed ref: 0...10 V
+10V Ref. voltage +10 V DC (max. 10 mA)
GND Analog circuit common / DO common
SCR Signal cable shield / DO screen
Safe torque off (STO)
SGND Safe torque off. Factory connection.
Both circuits must be closed for the
IN1
drive to start.
IN2
OUT1
BIO-01 I/O extension module 183
Base
unit
X
X
X
X
X
X
X
X
X
(3AXD50000029275 [English])
Internal connection
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents