Quick Installation And Commissioning Flowchart - ABB ACS380 Hardware Manual

Hide thumbs Also See for ACS380:
Table of Contents

Advertisement

24 Introduction to the manual

Quick installation and commissioning flowchart

Identify the frame size: R0, R1, R2, etc.
Plan the installation.
Check the ambient conditions, ratings and
required cooling air flow.
Unpack and check the drive.
If the drive will be connected to an IT
(ungrounded) system or corner-grounded TN
system, make sure that the internal EMC filter
is not connected.
Install the drive.
Route the cables.
Measure the insulation of the input cable,
motor and motor cable.
Connect the power cables.
Connect the control cables.
Examine the installation.
Commission the drive.
Task
Refer to
Type designation key
Planning the electrical installation
Technical data
on page 87.
Unpacking the delivery
Type designation key
Compatibility with IT (ungrounded) and
corner-grounded TN systems
Installing the drive
on page 44.
Routing the cables
on page 55.
Measuring insulation
Connecting the power cables
Connecting the control cables
Installation checklist
Refer to the ACS380 Quick installation and
start-up guide (3AXD50000018553 [English])
and the ACS380 Firmware manual
(3AXD50000029275 [English]).
on page 35.
on page 47.
on page 43.
on page 35.
on page 63.
on page 62.
on page 65.
on page 68.
on page 77.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents