Solar-Log 200 Installation Manual page 142

Hide thumbs Also See for 200:
Table of Contents

Advertisement

Smart Energy
Surplus offset [%]:
How much nominal plant output is to be fed into the grid and how much should be used for the Surplus
manage of the Smart Energy control logics can be defined in this box.
When output reduction is activated, a sensor has to be installed to determine the amount of theoretically
available production.
Surplus priority
In the
are displayed according to their priority (the first entry in the list has the highest priority). This can be ad-
justed at anytime with the drag and drop function.
Note!
142
section, the list of defined switching groups and the detected intelligent appliances
The prioritization occurs only for the surplus profiles and not, for example, for the run-
time control profiles.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 200 and is the answer not in the manual?

Questions and answers

Related Products for Solar-Log 200

This manual is also suitable for:

300500100012002000250

Table of Contents