Chapter 6—Installation Requirements
Figure 16. Mounting Space
C
A
D
Table 17. Space Requirements for Mounting the DG1 Series VFD and Airflow
Frame
Size
Voltage
hp (CT/I
FR1
230 Vac
0.75–3
480 Vac
1–5
575 Vac
2–5
3
FR2
230 Vac
4–7.5
480 Vac
7.5–15
575 Vac
7.5–15
3
FR3
230 Vac
10–15
480 Vac
20–30
575 Vac
20–30
3
FR4
230 Vac
20–30
480 Vac
40–60
575 Vac
40–60
3
FR5
230 Vac
40–60
480 Vac
75–125
575 Vac
75–125
3
FR6
230 Vac
75–100
3
480 Vac
150–200
575 Vac
150–200
3
Notes
1
Minimum clearances A and B for drives with Type 12 (IP54) enclosure is 0 mm (in).
2
kW ratings are at 400V / 50 Hz.
The above guidelines apply unless testing has been completed to validate a design outside of these recommendations.
3
FR6 and 575 Vac available in 2015.
24
DG1 Series VFD MN040002EN—March 2014 www.eaton.com
B
A
)
kW
Amperes
2
H
0.55–2.2
3.7–11
0.75–3.7
2.2–7.6
1.5–3.7
3.3–7.5
3–5.5
12.5–25
5.5–11
12–23
5.5–11
10–18
7.5–11
31–48
15–22
31–46
15–22
22–34
15–22
61–88
30–45
61–87
30–45
41–62
30–45
114–170
55–90
105–170
55–90
80–125
55–75
211–261
110–150
205–261
110–160
144–208
B
A
B
1
1
In (mm)
In (mm)
0.79
0.79
(20)
(20)
1.18
1.18
(30)
(30)
1.97
1.97
(50)
(50)
3.15
3.15
(80)
(80)
3.15
3.15
(80)
(80)
3
3
C
D
In (mm)
In (mm)
3.94
1.97
(100)
(50)
6.30
2.36
(160)
(60)
7.87
3.15
(200)
(80)
11.81
3.94
(300)
(100)
11.81
7.87
(300)
(200)
3
3
Cooling Air
Required
3
CFM (m
/h)
22
(38)
55
(94)
126
(214)
153
(260)
366
(622)
3