Quick Start; Quick Start Checklist - Procentec ComBricks User Manual

Profibus data hub for repeaters and fiber optics modules
Table of Contents

Advertisement

2 Quick start

2.1 Quick start checklist

This checklist lists all the steps to a quick usage of ComBricks.
STEP 1:
Provide the Head Station with the latest firmware.
STEP 2:
Prepare the backplane with the amount of required backplane units.
STEP 3:
Click the assembled backplane on the DIN-rail.
STEP 4:
Insert the Head Station in the most left slot.
STEP 5:
Insert the other modules in the remaining slots.
STEP 6:
Configure the repeater modules to their appropriate networks.
STEP 7:
Wire the repeater modules with PROFIBUS cables.
STEP 8:
Power the Head Station.
ComBricks units with Head Stations type 1A are now operational and no further steps have to be
taken. For type 1B and 1C Head Stations proceed with the next steps.
STEP 9:
Insert an Ethernet cable in the Head Station.
STEP 10: Set the IP address to the required value.
ComBricks units with Head Stations type 1B and 1C are now operational, ProfiTrace OE is
autonomously logging PROFIBUS events. After these basic steps ComBricks can be further configured
through the web server.
STEP 11: Checking the modules and administrative info in the web server.
STEP 12: Testing ProfiTrace OE on the PROFIBUS installation.
ComBricks User Manual v6.4.0 | January 18| © PROCENTEC
(7)
(2.2)
(2.2)
(2.3)
(2.3)
(2.4)
(2.5)
(2.6)
(2.7 + 2.8)
(2.9)
(2.10)
21/219

Advertisement

Table of Contents
loading

Table of Contents