Lff Drive Enablement Option - HPE ProLiant ML150 Gen9 User Manual

Table of Contents

Advertisement

Box 1
Remove the drive blanks.
14.
Install the hot-plug drives
15.
IMPORTANT: Populate drive bays based on the drive numbering sequence. Start from the
drive bay with the lowest device number. For device numbering information, see "Drive
numbering (on page 14)."
Install the fans (on page 24).
16.
Install the system air baffle (on page 22).
17.
If removed, install the PCI air baffle
18.
Install the access panel (on page 19).
19.
Return the server to an upright position.
20.
Connect each power cord to the server.
21.
Connect each power cord to the power source.
22.
Power up the server (on page 17).
23.
Install and lock the tower bezel
24.

LFF drive enablement option

To install the component:
Unlock and remove the tower bezel
1.
Power down the server (on page 17).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
4.
Remove the access panel (on page 18).
5.
If installed, remove the PCI air baffle (on page 20).
6.
Remove the system air baffle (on page 22).
7.
Remove the fans (on page 23).
8.
("Installing a hot-plug
drive" on page 39).
("PCI air baffle
("Install the tower
("Remove the tower
option" on page 57).
bezel" on page 18).
bezel" on page 17).
Hardware options installation 85

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents