Four-Bay Lff Non-Hot-Plug Drive Cage Option - HPE ProLiant ML150 Gen9 User Manual

Table of Contents

Advertisement

Route the power cable through the cable management clip, and then connect the opposite end of
d.
the power cable to the connector on the system board.
If two eight-bay SFF drive cages are installed, install the storage controller
14.
options" on page 58).
Connect all necessary cables to the storage controller. For internal drive cabling information, see
15.
"Storage cabling (on page 92)."
Remove the drive blanks.
16.
Install the hot-plug drives
17.
CAUTION: To prevent improper cooling and thermal damage, do not operate the server
unless all bays are populated with either a component or a blank.
Install the fans (on page 24).
18.
Install the system air baffle (on page 22).
19.
If removed, install the PCI air baffle
20.
Install the access panel (on page 19).
21.
Return the server to an upright position.
22.
Connect each power cord to the server.
23.
Connect each power cord to the power source.
24.
Power up the server (on page 17).
25.
Install and lock the tower bezel
26.

Four-bay LFF non-hot-plug drive cage option

To install the component:
Unlock and remove the tower bezel
1.
Power down the server (on page 17).
2.
Remove all power:
3.
Disconnect each power cord from the power source.
a.
Disconnect each power cord from the server.
b.
Place the server on its side.
4.
("Installing a hot-plug
drive" on page 39).
("PCI air baffle
("Install the tower
("Remove the tower
option" on page 57).
bezel" on page 18).
bezel" on page 17).
Hardware options installation 79
("Storage controller

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents