First Time Switch On - Honeywell Touchpoint Plus Technical Handbook

Wall-mounted controller
Hide thumbs Also See for Touchpoint Plus:
Table of Contents

Advertisement

6.2 First Time Switch On

Before switching power on, ensure that the system has been commissioned or that a qualified person has checked that
the wiring is safe and conforms to local regulations, and that all electrical connections are made in accordance with
Chapter 5. Also check that the battery isolator switches are 'On' if a backup battery is fitted.
Switch on power at the Isolator switch and wait for the system to initialise.
The system start up sequence may last for up to 5 minutes depending on the number of channels in use. During this time
the mA Output signals and Relay Output contacts are initialised to the inhibit state, with the Relay output being delayed by
approximately 30 seconds after the mA output inhibit ends.
TPPL will first display the auto-scrolling Input screen, indicating the current status of the system. The Channel List View is
shown below. The screenshot shows installed sensors but it may be blank depending on your system status:
You can alter the screen views or gain further information by touching the icons shown below:
Toggle to select screen layout
SD Card Status Good
SD Card Status Fault
External mains power is connected.
Touch for status
External power is not connected.
Touch for status
Event History (changes colour to show
fault, inhibit or alarm)
Further Menu Options
MAN0984_Iss 3_02/16
Pt. No. 3011M5001_3
Commissioning
Table 12.
Home Screen Menu Icons
48
Admin Logged in
Service Logged in
Operator Logged in
No one Logged in
Toggle auto-scroll on and off
Scroll up when auto-scroll disabled
Scroll down when auto-scroll disabled
Touchpoint Plus
Technical Handbook

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tppl

Table of Contents