INSTALL SOFTWARE

SETTINGS
 SETTINGS
 PRODUCT SETUP
3
5.
After the
RELAY SETTINGS:
"Programmed."
6.
Press the
ENTER
RELAY SETTINGS:
Not Programmed
7.
When the "NEW SETTING HAS BEEN STORED" message appears, the relay is in "Programmed" state and the "In Service"
LED turns on.
To activate the relay using EnerVista software:
1.
Navigate to Settings > Product Setup > Installation and change the Relay Settings field to "Programmed."
2.
Save the change.
3.6 Install software

3.6.1 EnerVista communication overview

The EnerVista UR Setup software communicates to the relay via the front panel RS232 or USB port or the rear RS485 /
Ethernet ports.
To communicate via the RS232 port, use a standard straight-through serial cable. Connect the DB-9 male end to the relay
and the DB-9 or DB-25 female end to the computer COM2 port as described in the CPU Communication Ports section
earlier in this chapter.
3-54
 SECURITY
 DISPLAY
 PROPERTIES
 INSTALLATION
Not Programmed message displays, press a
key to save the change.
RELAY SETTINGS:
Programmed
RELAY SETTINGS:
Not Programmed
key to change the selection to
VALUE
NEW SETTING
HAS BEEN STORED
G30 GENERATOR PROTECTION SYSTEM – INSTRUCTION MANUAL
CHAPTER 3: INSTALLATION