Avaya Media Gateway G350 User Manual page 163

Integrated management release 5.0
Hide thumbs Also See for Media Gateway G350:
Table of Contents

Advertisement

Table 60: CNA Configuration - Test Plug Parameters (continued)
Field
Test Plug 1
Administrative State
Test Plug 1 Status
Configuring the Converged Network Analyzer Application
Description
Administrative status of the test plug. Possible values are:
Enable
Disable
The status of the Test Plug operation. Possible values include:
Unregistered - The test plug is attempting to register and is
currently unregistered.
Scheduler List Exhausted - The test plug has exhausted its
scheduler list at least once, and is now attempting to register.
Idle - The test plug is registered, but idle.
Test - The test plug is running a test.
Suspend - The test plug is idle because a test was cancelled.
No IP Address - No IP address is configured for the test plug
interface.
Bad IP Address - The configured test plug IP address is not
properly configured for the test plug interface.
Empty Scheduler List - The scheduler list is empty. No
testing events were configured for this device.
Failed Control Port Bind - The test plug failed to bind the
UDP control port.
Failed FTP Port Bind - The test plug failed to bind to the UDP
port for RTP tests.
Suspend By Rate Limiter - The test plug was suspended by
its test rate limiter.
2 of 2
Issue 5 October 2007
163

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

G450 managerG250 manager

Table of Contents

Save PDF