Installation Personnel's Experience - Nordson VersaBlue VBN 50 Manual

Adhesive melters vbn without controller
Table of Contents

Advertisement

Installation Personnel's Experience

Screwing on Light Tower (Option)
Fig. 3-5
Casters
Installing Kit
Fig. 3-6
E 2008 Nordson Corporation
The instructions contained in this section are intended for personnel with
experience/authorization in the following fields:
S
Application methods with hot melt adhesive or similar materials
S
Industrial electrical wiring of power and control lines
S
Industrial mechanical installation
S
General knowledge of process control.
CAUTION: Illuminated seals may not be installed in the application system.
The light tower is not attached upon delivery of the melter. Use the two
screws M5 to fasten the light tower to the top of the electrical cabinet.
The kit consists of two pair of casters with brakes and one pair of fixed
wheels without brakes.
NOTE: Attach the casters with brakes (Fig. 3-6, right) to the side of the
electrical cabinet and in the center of a twin tank unit.
1. Lift the melter with a suitable floor conveyor (e.g. fork lift).
2. Detach machine feet.
3. Attach casters. Use the fastening holes for the machine feet to attach
the casters.
VBN w/o Control System
3-5
Installation
P/N 7146386A

Advertisement

Table of Contents
loading

Table of Contents