Additional Information; Installation Tasks; Experience Of Installation Personnel - Nordson AltaBlueA4TP Customer Product Manual

Tt adhesive melter
Table of Contents

Advertisement

3-2
Installation

Additional Information

Installation Tasks

Experience of Installation Personnel

Part 1107600_03
This section presents installation procedures in their most commonly used
form. Procedural variations or special considerations are explained in the
additional information table that follows most procedures. Where applicable,
some table entries also contain cross‐reference information. Additional
information tables are indicated by the symbol shown to the left.
The installation sequence is as follows:
1. Verify that the required installation conditions and utilities exist.
2. Unpack and inspect the melter.
3. Mount the melter on the parent machine or support structure.
4. Configure the electrical service.
5. Connect hot melt hoses and guns.
6. Set up the melter to work with the manufacturing process.
7. (Optional) Install inputs and outputs.
8. (Optional) Adjust the motor for manual or gear‐to‐line operation.
9. Install optional equipment.
10. Flush the melter.
11. Adjust the pressure control valve.
12. (Optional) Set up melter‐to‐PC communication.
The instructions provided in this section are intended to be used by
personnel who have experience in the following subjects:
S
Hot melt application processes
S
Industrial power and control wiring
S
Industrial mechanical installation practices
S
Basic process control and instrumentation
E 2014 Nordson Corporation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents