Installing Service Kit - Nordson VersaBlue VBN 50 Manual

Adhesive melters vbn without controller
Table of Contents

Advertisement

5-12
Maintenance
Pressure Control Valve

Installing Service Kit

Fig. 5-11
Mechanical pressure control valve
Service kit P/N: 394600
Required tools:
Open-end wrench, size 24
Pliers
Torque wrench
1.
Heat melter to operating temperature.
WARNING: Hot! Risk of burns. Wear appropriate protective
clothing/equipment.
2.
Relieve melter pressure.
4.
Refer to Measuring Insertion
Depth
5.
Use an open-end wrench to screw out the pressure control valve, then
extract with a pliers.
If the tank is not empty:
Collect any adhesive that may escape (bowl).
Quickly screw in a replacement pressure control valve or a plug, then perform
maintenance work.
6.
Remove old O-rings and disassemble and clean pressure control valve.
Refer to section Parts for detailed drawing. of the valve
NOTE: Disassemble valve only when warm.
7.
Install new O-rings. Apply grease to all threads and O-rings.
8.
Guide pressure control valve into the hole when the melter is warm and
tighten with torque wrench.
Torque: 15 Nm (133 lbin)
9.
Refer to Adjusting Setting Screw
P/N 7146386A
(contd.)
Each kit contains two O-rings and high-temperature grease.
Service kit P/N: 394600
Required tools:
Open-end wrench, size 27
Pliers
Torque wrench
3.
4.
9.
10. Open compressed air supply
again.
VBN w/o Control System
Pneumatic pressure control valve (option)
Close compressed air supply.
Unscrew air hose.
Attach air hose.
E 2008 Nordson Corporation

Advertisement

Table of Contents
loading

Table of Contents