Connecting - Nordson VersaBlue VBN 50 Manual

Adhesive melters vbn without controller
Table of Contents

Advertisement

Connecting

MXHH002S033A0295
Fig. 3-9
Fig. 3-10
1
2
3
Fig. 3-11
E 2008 Nordson Corporation
Second Open-end Wrench
Use a second open-end wrench when connecting and disconnecting the
hose. This prevents the unit's hose connection from turning.
NOTE: For units with recirculation hoses: Do not mistake recirculation
hoses for feed hoses.
The same installation instructions apply to recirculation hoses. The
connecting block for the recirculation hoses is located on the tank cover.
Refer to Fig. 3-10: The manual pressure control valves on the left side of
the connecting block are not visible.
Hose connection (ND 8)
Pressure control valve
If cold material can be found in the hose connection, the components (1, 2)
must be heated until the material softens (approx. 70 °C (158 °F),
depending on material).
WARNING: Hot! Risk of burns. Wear heat-protective gloves.
CAUTION: Close unused hose connections with Nordson port plugs.
VBN w/o Control System
Installation
P/N 446617
P/N 203059
3-9
P/N 7146386A

Advertisement

Table of Contents
loading

Table of Contents