Installing The Storpoint Nas In A Tower - Axis StorPoint NAS 100 User Manual

Network hard disk server
Hide thumbs Also See for StorPoint NAS 100:
Table of Contents

Advertisement

StorPoint NAS 100 User's Manual

Installing the StorPoint NAS in a Tower

Caution!
Caution!
Appendix D: Tower and Drive Installation
The StorPoint NAS is installed in standard 5.25 inch towers.
❏ To avoid the risk of electrical chock or other injury, disconnect
power from the tower before removing the chassis.
If not already installed in a tower when delivered, follow these steps:
1. Prepare the tower for the installation, e.g. by removing the chassis.
2. Make a note of the serial number of the StorPoint NAS, or attach the
enclosed product label to the back of the tower. The serial number is
found on the underside label of the StorPoint NAS and will be needed
during the TCP/IP configuration.
3. Slide the StorPoint NAS into the tower.
4. Fix the StorPoint NAS with the four screws supplied. Use the upper
or lower holes depending on type of tower and mounting.
❏ The length of the screws must not exceed 0.2 inch (5 mm). If they
do, the internal components of the StorPoint NAS may be
damaged.
5. Attach the power cord to the StorPoint NAS. The power supply
connector is a standard PC 4-pin power supply connector (12 and 5
V DC). Hence, the power supply available in the tower can also be
used to supply the StorPoint NAS.
107

Advertisement

Table of Contents
loading

Table of Contents