Section 2: Basic Installation
Installing the StorPoint CD/T in a CD-ROM Tower
Note:
Caution
Caution
If you are installing a standalone module StorPoint CD, skip this
section and continue with "Connecting CD-ROM Drives to the
StorPoint CD " on page 15.
The AXIS StorPoint CD/T is installed in standard 5.25 inch
CD-ROM towers.
To avoid the risk of electrical chock or other injury, disconnect power
from the tower before removing the chassis.
If not already installed in a tower when delivered, follow these steps:
1. Prepare the CD-ROM tower for the installation, e.g. by removing
the chassis.
2. Make a note of the serial number of the StorPoint CD/T for future
reference during the network configuration described later. You will
find the number on the underside label.
3. Slide the StorPoint CD/T into the tower.
4. Fix the StorPoint CD/T with the four screws supplied. Use the
upper or lower holes depending on type of tower and mounting.
The length of the screws must not exceed 0.2 inch (5 mm). If they do,
the internal components of the StorPoint CD/T may be damaged.
14
AXIS StorPoint CD User's Manual