• CC-link IE Controller Network
Device
Item
(s)[0]
(s)[1]
Completion status
(s)[2]
Modification
specification
(s)[3]
Host station No.
(s)[4]
(s)[9]
The UINI instruction can be executed only once. The UINI instruction cannot be executed again after
determination of station number. (It caused an error completion.)
However, in the case of the UINI instruction with the error completion, execute the UINI instruction again after
taking corrective action.
Program example
• The following program sets the station number 2. The following is an example for Ethernet.
[Structured ladder/FBD]
5 MODULE DEDICATED INSTRUCTION
216
5.4 Network Dedicated Instruction
Setting data
Specify 0.
The instruction completion status is stored.
0: Normal completion
Other than 0: Error completion (error code)
Specify the change target
0001H: With station number setting
Specify the station number of the host station.
Specify 0.
Process on completion
Process on normal completion
Process on error completion
Sets change
target
Sets host
station number
Performs
reinitialization
Execution finished
Normal completion
Error completion
Stores error code
Setting
Setting
range
side
0
User
System
0001H
User
1 to 120
User
0
User

Advertisement