Check Points Before Commissioning; Preparing The Boiler For Commissioning - REMEHA Gas 310 ECO PRO-285 Installation, User And Service Manual

Gas 310 eco pro series, gas 610 eco pro series
Table of Contents

Advertisement

Gas 310 ECO PRO - Gas 610 ECO PRO
Defect:
c
Boiler indicates a fault. This can be seen from the e code
and red display.
Hour counter menu:
\
Readout of the operating hours, number of successful starts
and hours on mains supply.
Outside sensor:
Only if an outside temperature sensor is connected
Z
(Accessory).
Battery symbol:
g
Status of battery of wireless controller (If connected).
5.2

Check points before commissioning

160514 - 125467-05
Antifreeze protection:
]
Boiler is running in frost protection mode.
Burner level:
I
Output level .
Signal strength symbol:
Signal strength of the wireless controller (If
[
connected)..
5.2.1.

Preparing the boiler for commissioning

For work on the boiler Gas 610 ECO PRO: The features
and instructions described are for each boiler module.
WARNING
Do not put the boiler into operation if the supplied gas is
not in accordance with the approved gas types.
Preparatory procedure for boiler commissioning:
4 Check that the gas type supplied matches the data shown on the
boiler's data plate.
4 Check the gas circuit.
4 Check the hydraulic circuit.
4 Check the water pressure in the heating system.
4 Check the tightness of the flue gases evacuation and air inlet
connections.
4 Check the electrical connections to the thermostat and the other
external controls.
4 Check the other connections.
4 Test the boiler at full load. Check the setting of the gas/air ratio
and, if necessary, correct it.
4 Test the boiler at part load. Check the setting of the gas/air ratio
and, if necessary, correct it.
4 Finalizing work.
4 Complete the checklist.
¼See chapter: "Checklist for commissioning", page 77.
5. Commissioning
51