Maintenance Activities, Controller Irc5 - ABB IRC5 Product Manual

Panel mounted controller
Hide thumbs Also See for IRC5:
Table of Contents

Advertisement

3 Maintenance activities, controller IRC5

3.1. Maintenance schedule, controller IRC5
General
The IRC5 robot controller must be maintained at regular intervals to ensure its function. The
maintenance activities and their respective intervals are specified below:
Intervals
Equipment
Complete
controller modules
Drive system fans Inspection
Drive system fans Cleaning
FlexPendant
*) The time interval depends on the working environment of the equipment: a cleaner
environment may extend the maintenance interval and vice versa.
3HAC027707-001 Revision: D
3 Maintenance activities, controller IRC5
3.1. Maintenance schedule, controller IRC5
Maintenance
Interval
activity
Inspection
12 months *
6 months *
12 months
Cleaning
When needed
Detailed in
Note!
section:
Inspection of the
controller on
page
96.
Inspection of the
controller on
page
96.
Cleaning of the
IRC5 controller
on page
Cleaning the
FlexPendant on
page
100.
99.
95

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents