Oil Pump Seal - Jeep cherokee 2000 Service Manual

Hide thumbs Also See for cherokee 2000:
Table of Contents

Advertisement

21 - 268
AW–4 AUTOMATIC TRANSMISSION
REMOVAL AND INSTALLATION (Continued)
Fig. 92 Removing/Installing Transmission Throttle
1 – THROTTLE CABLE
2 – CABLE BRACKET
Fig. 93 Removing/Installing Transmission Throttle
Cable And Bracket
1 – THROTTLE CABLE
2 – CABLE BRACKET
INSTALLATION
(1) Lubricate and install new seal on cable.
(2) Insert cable in transmission case.
(3) Attach cable to throttle cam (Fig. 92).
(4) Install cable bracket on case and tighten
attaching bolt to 10 N·m (7 ft. lbs.) torque (Fig. 93).
(5) Install pan and tighten pan bolts to 7 N·m (65
in. lbs.) torque.
Cable
(6) Install new gasket on oil pan drain plug.
Install and tighten plug to 20 N·m (15 ft. lbs.) torque.
(7) Connect cable to engine bracket and throttle
linkage.
(8) Fill transmission with Mopar
IIE.
(9) Adjust the cable as described in cable adjust-
ment procedure.

OIL PUMP SEAL

REMOVAL
(1) Remove converter.
(2) Remove old seal. Use blunt punch to collapse
seal and pry seal out of pump housing. Do not
scratch or damage seal bore.
INSTALLATION
(1) Lubricate lip of new seal with transmission
fluid and install seal in pump with tool 7549 (Fig.
94).
Fig. 94 Installing Oil Pump Seal
1 – PUMP SEALER INSTALLER
(2) Lubricate converter drive hub with transmis-
sion fluid.
(3) Align and install converter in oil pump.
XJ
Dexron/Mercon

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents