Jeep cherokee 2000 Service Manual page 1336

Hide thumbs Also See for cherokee 2000:
Table of Contents

Advertisement

23 - 8
BODY
REMOVAL AND INSTALLATION (Continued)
(15) Force the windshield glass inward just enough
to wet-out and set the urethane. Use care to avoid
excessive squeeze-out of adhesive.
(16) Water test the windshield with a water spray
after installation. Do not direct high pressure
streams of water directly at urethane. If any leaks
are detected, apply urethane as necessary.
(17) If used, remove the masking tape from the
inner surface of the glass.
(18) Install all components and clean the vehicle.
(19) Open the vehicle windows to prevent interior
pressure while the urethane is curing. If not
vented, pressure in the interior of the vehicle
may interfere with proper glass bonding.
(20) Install the rearview mirror.
Fig. 2 Work Surface Set up
1 – WINDSHIELD AND MOLDINGS
2 – BLOCKS
Fig. 3 Masking Tape Location For Blackout Primer
1 – POSITION TAPE 5/8 INCH FROM EDGE OF GLASS
2 – 1-INCH WIDE MASKING TAPE
INSTALLATION—EXTENDED METHOD
WARNING: REVIEW ALL WARNINGS AND CAU-
TIONS IN THIS GROUP BEFORE PRECEDING WITH
INSTALLATION.
Fig. 4 Blackout Primer Application
1 – APPLY PRIMER TO THIS AREA OF GLASS
2 – BLACKOUT PRIMER APPLICATOR
3 – TAPE
Fig. 5 Windshield Bottom Support Spacers
1 – SUPPORT SPACERS
2 – WINDSHIELD
3 – SUPPORT SPACER
4 – COWL
5 – MOLDING
(1) Remove the all of urethane from all pinchweld
flanges.
XJ

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents