Jeep cherokee 2000 Service Manual page 927

Hide thumbs Also See for cherokee 2000:
Table of Contents

Advertisement

XJ
DISASSEMBLY AND ASSEMBLY (Continued)
Fig. 55 Remove Fifth Gear Thrust Ring Lock Ball
1 – PENCIL MAGNET
2 – CLUSTER GEAR
3 – LOCK BALL RECESS
4 – THRUST RING LOCK BALL
(9) Remove bolt holding reverse idler gear shaft
lock plate to the intermediate plate.
(10) Remove reverse idler gear shaft and reverse
idler gear assembly (Fig. 56).
NOTE: Be sure to retrieve the pin and compression
spring from the reverse idler shaft.
(11) Remove bolts holding output shaft rear bear-
ing retainer to the intermediate plate and remove
retainer (Fig. 57).
Fig. 56 Remove Reverse Idler Shaft
1 – REVERSE IDLER SHAFT
AX5 MANUAL TRANSMISSION
Fig. 57 Remove Output Shaft Rear Bearing Retainer
1 – OUTPUT SHAFT REAR BEARING RETAINER
(12) Remove bolts holding 1–2 and 3–4 shift forks
to the shift rails (Fig. 58) and discard bolts.
(13) Remove bolts holding reverse shift arm
bracket to intermediate plate (Fig. 59).
Fig. 58 Remove Shift Fork To Shift Rail Bolts
1 – 1–2 SHIFT FORK
2 – 3–4 SHIFT FORK
21 - 19

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents