Verification After Power-On - HP FlexFabric 12500E Installation Manual

Routing switch
Table of Contents

Advertisement

<Sysname>
NOTE:
The 12500E routing switches provide a command line interface (CLI). For more information about
the CLI, see
Guide.
The output depends on your switch model.

Verification after power-on

HP recommends that you check the following conditions after the switch is powered on:
The cooling system is operating. You should be able to hear fan rotation noise and feel air being
blown out.
All the system LEDs on the MPUs are functioning correctly.
Table 11 LED status when the 12508E/12518E operates correctly
Module
MPU
LPU
Switching fabric module
Power monitoring
module
Fan
Connecting the switch to the network
TIP:
After connecting the switch to the network, you can use the ping or tracert command to check the
interoperability between the switch and network. For more information, see
12500E Routing Switch Series Network Management and Monitoring Configuration Guide
HP FlexFabric 12500 and 12500E Routing Switch Series Fundamentals Configuration
LED
SFC (red and green)
LC (red and green)
FAN (red and green)
PWR (red and green)
ACT (green)
RUN (red and green)
RUN (red and green)
RUN (red and green)
RUN (green)
ALM (red)
RUN (green)
ALM (red)
Status
Flashing green
Flashing green
Flashing green
Flashing green
Steady on
Flashing green
Flashing green
Flashing green
Flashing
Off
Flashing
Off
45
HP FlexFabric 12500 and
.

Advertisement

Table of Contents
loading

Table of Contents