Figure 7 Depth for the 12508E/12518E DC chassis with expansion cable management brackets
1
(1) Ejector lever on the switching fabric module
Installation tools
You can use the following tools for installation.
Accessories supplied by the switch
Item
Console cable
Grounding cable
M6*12 screw
M6 cage nut
ESD wrist strap
659 mm
(25.94 in)
(2) Expansion cable management bracket
Quantity
1
1
1 set
1 set
2
12
154 mm
(6.06 in)
2
Purpose
Connects the console port and the
configuration terminal for switch login.
Grounds the switch.
Secures the switch to the rack.
ESD prevention.