Installation tools
Accessories provided with the router
Power cord
•
Console cable
•
Grounding cable
•
User-supplied tools and equipment
Phillips screwdriver P1 – 100 mm, P2 – 150 mm and P3 – 250 mm
•
Plain screwdriver P4 – 75 mm
•
•
Screws with various specifications
Meters and equipment such as HUB, terminal, and multimeter
•
ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags
•
Electric drill (for wall-mounting the router)
•
Hammer
•
Pre-installation checklist
Table 5 Pre-installation checklist
Item
Installation
site
Requirements
•
Ventilation
•
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
5% to 90% (noncondensing)
Cleanness
Dust concentration ≤ 3 × 10
•
•
•
•
ESD prevention
•
•
•
EMI prevention
•
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
The installation site ventilation system is adequate.
The equipment and floor are properly grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at proper
levels.
Wear an ESD-preventive wrist strap when inspecting or
handling a circuit board.
Place any removed memory module, CF card, or
interface module face-up on an antistatic workbench or
in an antistatic bag.
Touch only the edges, not any electronic components,
when inspecting or handling a memory module, CF
card, or interface module.
Take measures to protect the power system from the
power grid system.
Keep the protection ground of the router as far away
from the grounding device or lightning protection
grounding device as possible.
8
4
particles/m
3
Yes No