Installation Tools; Pre-Installation Checklist - HP MSR900-W Installation Manual

Table of Contents

Advertisement

Installation tools

Accessories provided with the router
Power cord
Console cable
Grounding cable
User-supplied tools and equipment
Phillips screwdriver P1 – 100 mm, P2 – 150 mm and P3 – 250 mm
Plain screwdriver P4 – 75 mm
Screws with various specifications
Meters and equipment such as HUB, terminal, and multimeter
ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags
Electric drill (for wall-mounting the router)
Hammer

Pre-installation checklist

Table 5 Pre-installation checklist
Item
Installation
site
Requirements
Ventilation
Temperature
0°C to 45°C (32°F to 113°F)
Relative humidity
5% to 90% (noncondensing)
Cleanness
Dust concentration ≤ 3 × 10
ESD prevention
EMI prevention
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
The installation site ventilation system is adequate.
The equipment and floor are properly grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at proper
levels.
Wear an ESD-preventive wrist strap when inspecting or
handling a circuit board.
Place any removed memory module, CF card, or
interface module face-up on an antistatic workbench or
in an antistatic bag.
Touch only the edges, not any electronic components,
when inspecting or handling a memory module, CF
card, or interface module.
Take measures to protect the power system from the
power grid system.
Keep the protection ground of the router as far away
from the grounding device or lightning protection
grounding device as possible.
8
4
particles/m
3
Yes No

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msr920-w na

Table of Contents