Installation Tools; Pre-Installation Checklist - HP MSR930 3G Instructions Manual

Table of Contents

Advertisement

Installation tools

Accessories provided with the router
Power cord
Console cable
Grounding cable
User-supplied tools and equipment
Phillips screwdriver
Flat-blade screwdriver
Screws with various specifications
Meters and equipment such as HUB, terminal, and multimeter
ESD-preventive gloves or wrist strap, ESD-preventive mat, anti-static bags
Electric drill (for wall-mounting the router)
Hammer

Pre-installation checklist

Table 4 Pre-installation checklist
Item
Ventilation
Temperature
Relative humidity
Cleanness
Installation
ESD prevention
site
EMI prevention
Requirements
There is a minimum clearance of 10 cm (3.9 in) around
the router chassis intake and exhaust vents for heat
dissipation.
The installation site ventilation system is adequate.
0°C to 40°C (32°F to 104°F)
5% to 90% (noncondensing)
Dust concentration ≤ 3 × 10
4
particles/m
The equipment and floor are properly grounded.
The equipment room is dust-controlled.
Humidity and temperature are maintained at proper
levels.
Wear an ESD-preventive wrist strap when inspecting or
handling a circuit board.
Take measures to protect the power system from the
power grid system.
Keep the protection ground of the router as far away
from the grounding device or lightning protection
grounding device as possible.
Keep the router far away from radio transmitters, radar,
and high-frequency or high-voltage devices.
Use electromagnetic shielding when necessary.
7
Yes No
3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msr930Msr930 seriesMsr931Msr931 3gMsr931 dual 3gJg511a ... Show all

Table of Contents