Rack-Mounting Requirements; Installation Tools - HP A-MSR20 Installation Manual

Hide thumbs Also See for A-MSR20:
Table of Contents

Advertisement

Rack-mounting requirements

Before rack-mounting a switch, make sure the rack meets the following requirements:
Size. The rack must be appropriately sized to hold the switch.
Ventilation. HP recommends that you mount a switch in an open rack. If you mount a switch in a
closed rack, provide an adequate heat dissipation system. With either type of rack, there must be
enough space around the switch's left and right panels for unimpeded airflow and heat dissipation.
Sturdy support. The rack must provide steady, secure support for the switch and accessories.

Installation tools

Accessories supplied with the router
Power cord
Console cable
Grounding cable
Mounting brackets
User-supplied tools and equipment
Phillips screwdriver P1 – 100 mm, P2 – 150 mm, and P3 – 250 mm
Flat-bladed screwdriver P4 – 75 mm
Screws with different specifications
Meters and equipment such as HUB, terminal, and multimeter
ESD-preventive gear, including gloves or wrist strap, mat or other work surface, and antistatic bags
6

Advertisement

Table of Contents
loading

Table of Contents