Installation Tools; Installation Accessories; Checklist Before Installation - HP MSR2000 Series Manual

Hide thumbs Also See for MSR2000 Series:
Table of Contents

Advertisement

For heat dissipation and device maintenance, make sure the front and rear of the rack are at least
0.8 m (2.62 ft) away from walls or other devices, and the headroom in the equipment room is no
less than 3 m (9.84 ft).

Installation tools

Flathead screwdriver
ESD-preventive wrist strap Hiagonal pliers

Installation accessories

Checklist before installation

Table 4 Checklist before installation
Item
Installation site
Phillips screwdriver
Needle-nose pliers
Requirements
Ventilation
Wire-stripping pliers
Blow dryer
Drill
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet vents for heat
dissipation of the router chassis.
A good ventilation system is available at the
installation site.
5
Claw hammer
Marker
Result

Advertisement

Table of Contents
loading

Table of Contents