Considerations - Mitsubishi Electric MELSEC IQ-R series Reference Manual

Programmable controller
Hide thumbs Also See for MELSEC IQ-R series:
Table of Contents

Advertisement

■Modules other than MELSEC-QnA series
Network
CC-Link IE Field Network
CC-Link IE Controller Network
MELSECNET/H
Ethernet
Page 21 Modules that can be relayed between networks
14.3

Considerations

The following shows the considerations when using MELSEC-QnA series devices.
Considerations when connecting E71
■Setting range of monitoring timer
When accessing QnACPU for the first time, the wait time for CPU monitoring timer is required before receiving a response
message because QnACPU identifies the CPU type. Be sure to set a value within the setting range shown below.
Access target
Connected station (host station)
Other station
Module type
CC-Link IE Field Network master/
local module
CC-Link IE Controller Network
module
MELSECNET/H module
Ethernet interface module
Monitoring timer
1H to 28H (0.25 s to 10 s)
2H to F0H (0.5 s to 60 s)
Model
LJ71GF11-T2, QJ71GF11-T2, QS0J71GF11-T2
QJ71GP21-SX, QJ71GP21S-SX
QJ71LP21, QJ71LP21-25, QJ71LP21S-25, QJ71LP21G, QJ71BR11,
QJ71NT11B
LJ71E71-100, QJ71E71-100, QJ71E71-B5, QJ71E71-B2, QJ71E71
14 MELSEC-QnA SERIES SUPPORTED SPECIFICATIONS
287
14.3 Considerations
14

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsecq seriesMelsec l series

Table of Contents