3. Install the connector of the operator information panel on the system board.
Figure 49. Installation of the connector of an operator information panel
4. Use a T8 torx (part number 00FK488, provided on the back of the chassis)
Figure 50. Screw installation
Removing the power paddle card from the GPU tray
Use this information to remove the paddle card from the GPU tray.
To remove the paddle card from the GPU tray, complete the following steps:
1. Read the safety information that begins on "Safety" on page vii and
2. Turn off the compute node and peripheral devices and disconnect the power
3. Remove the cover (see "Removing the compute node cover" on page 110).
4. Remove the air baffle (see "Removing the air baffle" on page 113).
5. Make a note of where cables are attached to the power paddle card; then,
6. Remove the four screws that secure the power paddle card to the GPU tray and
7. Slide the power paddle card out of the GPU tray.
128
IBM NeXtScale nx360 M4 Type 5455: Installation and Service Guide
screwdriver to install the screw to the operator information panel.
Screw
"Installation guidelines" on page 93.
cords and all external cables (see "Turning off the compute node" on page 16).
disconnect them.
save them for future use.
T8 torx screwdriver
Back of chassis