Installing the Server

These topics describe how to install the server into a rack equipped with square mounting holes.
If you are installing the server into a rack equipped with round mounting holes, see
Correct Rackmount Hardware" on page
If the rackmount kit came with its own instructions, use the instructions instead of the
Note -
instructions in this chapter. After performing the server installation, proceed to
the Server for the First Time"
Step
Description
1.
Ensure that your rack is compatible with the
server requirements.
2.
Determine the correct rackmounting hardware
and install the hardware.
3.
(Optional) Install the CMA. There are two
types of CMAs. Note which type you have for
applicable instructions.
4.
If you are installing the server into a rack that
will be shipped to another location, install the
shipping brace assembly.
5.
Install the server in the rack.
6.
Review cabling requirements and port
information. Attach data and management
cables to the server.
7.
Configure the Oracle ILOM SP and power on
the server for the first time.
Related Information
"Understanding the Server"
"Connecting the Server Cables"
36.
for first-time power on.
Links
"Rack Compatibility " on page 30
"Determine Correct Rackmount
Hardware" on page 36
"Mark the Rackmounting Location" on page 36
"Install the Rackmount Hardware" on page 37
"Installing the CMA" on page 42
"Shipping Brace Assembly" on page 48
"Install the Server" on page 53
"Connecting the Server Cables"
"Powering On the Server for the First Time"
"Determine
"Powering On
Installing the Server
29