Adhere to the minimum airflow clearance specifications. See
Specifications" on page
Install the server so the front faces the cool aisle and the rear faces the warm aisle.
Do not direct warm air into the server.
Prevent recirculation of air within a rack or cabinet.
When servicing server internal components, ensure that air ducts and baffles are properly
installed.
Route cables so they do not interfere with airflow.
Related Information
"Rack Cautions" on page 31
"Physical Specifications" on page 17
"Electrical Specifications" on page 18
"Environmental Requirements" on page 19
17.
Airflow Precautions
"Physical
Confirming Specifications