(6) Detaching and refitting the operation panel PWB 1
Procedures
1. Open the front cover.
2. Open the right cover1.
3. Remove the front upper cover.
4. Remove two screws and then remove
the operation panel lower cover.
5. Remove four screws and then rotate
the operation panel upper unit.
Screw
Screw
Figure 1-5-89
Figure 1-5-90
1-5-52
2NL/2P8
Operation panel
lower cover