(2) Detaching and refitting the operation panel
Procedure
1. Release four hooks and then remove
the operation panel.
2. Remove the FFC from connector.
3. Check or replace the operation panel
and refit all the removed parts.
Operation panel
Hook
Hook
FFC
1-5-63
Connector
Hook
Figure 1-5-96
2KW/2KX
Hook