Settings For Initial Commissioning By The Service Engineer; Commissioning; Washing With Dish-Washer; Operating Panel - Meiko DV 80.2 Operating Instructions Manual

Table of Contents

Advertisement

Operating instructions DV 80.2 / DV 120.2 / DV 125.2 / DV 200.2 / DV 200.2 PW
IMPORTANT!
IMPORTANT
IMPORTANT!
Datei:BA_DV80.2_120.2_125.2_200.2_200.2PW_9625769_EN_2002-10.doc
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
7
Settings for initial commissioning by the service
engineer
7.1

Commissioning

In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers must be carried out. More
detailed information, if required, can be found in the relevant Instructions for Use.
The installation may only be commissioned by suitably qualified persons
observing the safety instructions.
Before initial startup, check that any tools and parts not belonging to the
installation have been removed.
Check whether any escaping liquid is removed.
Activate all the safety systems and hood switches before commissioning.
Check that all screw connections are tight.
Please also read the chapter on "General safety instructions ".
Commissioning and instructions will be provided by technicians specially trained
by Meiko. The operator may only use the installation after training has been
provided.
The "Commissioning certificate for GiO modules" is to be observed for machines
equipped with the GiO module and the instructions adhered to accordingly.
8

Washing with dish-washer

The appliance must not be used without a thorough knowledge of the "Operating
Instructions". Incorrect operation could result in injuries to personnel or damage to the
appliance.
Only of automatic hood
Climbing alongside the washing machines while they are in operation is prohibited. The
same applies when cleaning the washing machines.
8.1

Operating panel

Program is running
appliance is switched on
Temperature display tank / boiler,
Fault display
Information display
Code display
Illustration 1; Operating panel
W e reserv e the right to change execution and construction!
Program start key
Program is
"Off" key
running
Of automatic hood
Open-close hood key
9625769
15/46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents