Operating instructions EcoStar 430 F-M
CAUTION!
Datei:1_EcoStar430F-MIKE_9702129_Betriebsanleitung_EN_2012-07.docx
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121
6.9
Instructions for disposal of packing material
The four-sided wooden frame consists of untreated, raw wood.
Special country-specific import regulations may also stipulate the use of wood which
has been treated against pests.
The plastic sheeting (PE sheeting) may be recycled.
The cardboard used as edge protection can also be recycled.
The hoop-casing strip made of steel can be recycled together with the steel scrap.
The plastic tensioning strap of plastic (PP) can be recycled.
7
Settings for initial commissioning by the service engi-
neer
7.1
Setting in operation
In order to avoid damage to the installation and the injury and death of persons when
commissioning the installation, the following points must be observed without fail:
Any necessary initial tests to parts supplied by sub-suppliers must be carried out. More
detailed information, if required, can be found in the relevant Instructions for Use.
The installation may only be commissioned by suitably qualified persons ob-
serving the safety instructions.
Before initial startup, check that any tools and parts not belonging to the instal-
lation have been removed.
Check whether any escaping liquid is removed.
Activate all the safety systems and door switches before commissioning.
Check that all screw connections are tight.
- Read the chapter „General safety rules".
Instructions will be given by the service engineers installing the system, setting
in operation will also be executed by them. The system can only be used by the
operator after having been carefully instructed.
8
Washing with dish-washer
The appliance must not be used without a thorough knowledge of the "Operating In-
structions". Incorrect operation could result in injuries to personnel or damage to the
appliance.
8.1
Operating panel
Program is running /
Appliance is switched on
Temperature display tank /boiler;
Fault display
Information display
Code display
Illustration 1; Operating panel
ustration 1; Operating panel
Update:
W e reserv e the right to change execution and construction!
Program is running
Program star key
9702129
OFF key
14/38