Table of Contents

Advertisement

Operating instructions DV 80.2 / DV 120.2 / DV 125.2 / DV 200.2 / DV 200.2 PW
Maintenance work should only be conducted by authorised MEIKO personnel.
Maintenance procedures
1. Pumps
Check pumps for watertightness, pump rotor noise, rotation
direction and function
Check pump suction
Check pump sieves correctly fitting and operating correctly
Check sliding ring washer/contra-rotation ring
2. Wash systems
Check water level in tank
Check that wash water pipe is watertight
Check washing system is complete and produces correct spray
pattern
Check wash arm hubs
3. Fresh water rinse
Check flow water pressure
Check rinsing system is complete and produces correct spray
pattern
Check that system is watertight
4. Housing and mounting parts
Check housing, tank, sheet metal cover, hood, doors and
covering of machine base for damage and correct operation
Check tank cover sieves
Check boiler, hoses, clamps, plastic parts and seals
Check operation of raising and lowering equipment
5. Fresh water installation
Check level regulation
Check valves, clean dirt trap
Check that all connections (incl. hand spray) are watertight
Check settings of built-in water softener (if fitted)
Check operation of complete or partial water softener (if fitted)
For the GiO module: Perform pre-filter change
(must be completed every 6 months at the latest)
Check water hardness
6. Waste water equipment
Check if watertight
Check pressure hose position and operation of drain pump
7. Electrical installation
Check of all fuses
Tighten all electrical connections
Check tank and boiler heating
Check thermostat and stop switch
Datei:BA_DV80.2_120.2_125.2_200.2_200.2PW_9625769_EN_2002-10.doc
MEIKO Maschinenbau GmbH & Co. KG, Englerstr. 3, D-77652 Offenburg, Tel.: +49/781/203-0, Fax: +49/781/203-1121

19.3 Maintenance plan

W e reserv e the right to change execution and construction!
NOTE
9625769
44/46

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents